Electronic Central Unit Assembling and Testing Line

Fully automatic assembling and testing line of a family of N.3 ECU for battery management system designed for full electric car passenger

Key points

PCBA depanneling just-in time: Osai Router
integrated in the line

Guide robot for picking housing from blister

N. 8 assembly stations

N. 3 EOL test stations

Plastic pins hot riveting process to fix the PCBA
into the housing  without screws (developed by Osai)

Takt time 18 sec/pc

Functional test at 100%

Full traceability , MES integration

Electronic Central Unit Assembling and Testing Line

Fully automatic assembling and testing line of a family of N.3 ECU for battery management system designed for full electric car passenger

Key points

PCBA depanneling just-in time: Osai Router
integrated in the line

Guide robot for picking housing from blister

N. 8 assembly stations

N. 3 EOL test stations

Plastic pins hot riveting process to fix the PCBA
into the housing  without screws (developed by Osai)

Takt time 18 sec/pc

Functional test at 100%

Full traceability , MES integration